Assigned issues (2)

Resolution: These issues are already assigned to someone. Is the issue assigned to you? If there's nothing more urgent, try to finish what you started. Is the issue assigned to someone else? Are they actually working on it? Ask them if they are still engaged on the issue, and unassign it if they are not.

Average age: 365.5d, Avg wait: 0.0d
ID Au Desc As Rea Cr Up Re Cmntrs Labels Tags
28 PRs should not be considered stale after a push 1y 8mo
type: bug
priority: P2
assigned
open-milestone
49 shaka-lab-hub stuck after some kind of network failure 8mo 8mo
type: bug
priority: P1
platform: Linux
package: shaka-lab-hub
assigned
open-milestone
Unassigned P0 issues: No matching items
Unassigned P1 issues: No matching items

Unassigned P2 issues (1)

Resolution: Fix bugs! This is the "fun" part. 1. Try to reproduce the issue. Some options for repro: • Use the demo's "custom content" tab • Write a new unit or integration test to simulate the scenario in the report • This lets you run tests in the lab on non-desktop browsers 2. If the issue cannot be reproduced, set "status: unable to reproduce" 3. Once the issue can be reproduced, try to fix it or assign it to someone who can

Average age: 356.5d, Avg wait: 0.0d
ID Au Desc As Rea Cr Up Re Cmntrs Labels Tags
41 shaka-lab-browsers upgrade error on Mac 11mo 11mo
type: bug
priority: P2
platform: macOS
package: shaka-lab-browsers
open-milestone

Unassigned P3 issues (2)

Resolution: Fix bugs! This is the "fun" part. 1. Try to reproduce the issue. Some options for repro: • Use the demo's "custom content" tab • Write a new unit or integration test to simulate the scenario in the report • This lets you run tests in the lab on non-desktop browsers 2. If the issue cannot be reproduced, set "status: unable to reproduce" 3. Once the issue can be reproduced, try to fix it or assign it to someone who can

Average age: 1196.1d, Avg wait: 0.0d
ID Au Desc As Rea Cr Up Re Cmntrs Labels Tags
31 Add tests beyond linting
2y 2y
type: CI
priority: P3
open-milestone
pr-merged
13 Consider merging the tunneling docs
3y 2y
type: docs
priority: P3
open-milestone
pr-merged
Unassigned P4 issues: No matching items
Triage Party v1.4.0